Abstract:
|
(En)
The Bodallin catchment is a large 100,000 ha catchment centred around Bodallin in the Yilgarn Shire. Runoff and flooding of the valley floor are the main land degradation issues of the area. A number of trials and demonstrations were established in Bodallin between 1987 and 1989. The results of this work form the basis of this report and the recommendations.
|