Abstract:
|
(En)
Test pumping of a production bore in Narrogin took place for 24 hours in August 2003. Data generated by the test pumping was analysed along with groundwater monitoring, climate and geological data. Laboratory analyses of water samples from the production bore indicate very high levels of salinity and hardness which may lead to severe scaling and corrosion of pumps, pipes and pipe fittings.
|